Barely has public outrage over anomalous flood control projects subsided when another irregularity has surfaced in the proposed 2027 budget: double appropriations for some flood control projects, Senator Ping Lacson revealed.
Lacson said he would seek the removal of the duplicate – or even multiple – appropriations during the Senate’s deliberations on the measure, and if needed, during the bicameral conference committee proceedings.
“Meron pa rin kaming nasilip. Double appropriations. Flood control na nga, doble pa ‘yung appropriations,” the veteran legislator said in an interview on DZMM radio.
“This is aside from at least 30 ghost multi-purpose buildings (MPBs) spotted in the budget measure.”
The seasoned lawmaker said this was aside from at least 30 ghost multi-purpose buildings (MPBs) spotted in the budget measure, which he said he will also move to remove.
Over the weekend, the senator slammed the appropriations for 3,950 MPBs, separate from the Local Government Support Fund (LGSF) Financial Assistance to local government units (LGU) subprogram that covers 1,584 MPBs from 2022 to 2026.
He cited at least one case where some MPBs received appropriations in previous years including 2024, 2025 and 2026, yet no structure had been built at the designated sites as of 2026.
“Ang na-flag ng team namin at least 30 kung saan saang sulok ng Pilipinas,” Lacson said.
Citing initial findings, he said MPBs also involved “commissions” although not as lucrative as in the case of flood control projects.
Lacson said the “standard” commissions for MPBs may reach up to 10 percent. Earlier this year, he cited kickbacks of 15 to 30 percent for proponents of anomalous flood control projects.
For now, Lacson said he and his staff continue to comb through the budget measure to find such items, and move to have them scrapped from the bill.
‘Pag maipakita naman sa aming mga kasamahan na hindi kailangan kasi doble na ‘yung appropriation sa iisang proyekto, palagay ko, matuwid naman na tanggalin ‘yun hanggang sa bicam.”
“Sa Senate version lang, mayroon pa kaming period of amendments. ‘Pag maipakita naman sa aming mga kasamahan na hindi kailangan kasi doble na ‘yung appropriation sa iisang proyekto, palagay ko, matuwid naman na tanggalin ‘yun hanggang sa bicam,” he said.
“Hanggang ngayon, patuloy pa rin ‘yung pagkalkal namin, nadadagdagan ‘yung mga ganong klaseng mga appropriations. ‘Pag doble, dapat tanggalin na talaga ‘yung isa. Quadruple, tanggalin ‘yung tatlo,” Lacson concluded.


