Categories
Government

PTFOMS: CLASSIFY AMPATUAN CASE AS RESOLVED

The Presidential Task Force on Media Security (PTFoMS) is calling on the United Nations Educational, Scientific and Cultural Organization (UNESCO) to heed the cries for justice of the families and colleagues of the victims of the Ampatuan massacre by classifying the case as resolved. The PTFoMS made the statement as it commemorated the 1st anniversary […]

Categories
Politics

QC BANS MINORS IN PUBLIC PLACES – BELMONTE

Minors in Quezon City are not allowed in all public places, whether alone or accompanied by a parent or guardian and without any justification, to protect them from the coronavirus disease 2019 (COVID-19). Mayor Joy Belmonte approved Ordinance No. SP-2985, S-2020, or the “Quezon City Special Protection of Children against COVID-19”, directing all those below 18 years […]

Categories
Government

QC OPENS COVID MODULAR HOSPITAL, DORM – VILLAR

The Department of Public Works and Highways (DPWH) turned-over recently to the Department of Health (DOH) the newly-completed coronavirus disease (COVID-19) health facilities at the Quezon Institute compound in E. Rodriguez, Quezon City. DPWH Secretary and Isolation Czar Mark Villar turned over to DOH Undersecretary and Treatment Czar Leopoldo Vega two units of modular hospital […]

Categories
Government

DPWH COMPLETES CONCRETE DIKES IN BANGAR, LA UNION

The Island Barangay of Mindoro in Bangar, La Union is now safe from extreme damages brought by flooding with the completion of a 207-lineal meter concrete dike constructed by the Department of Public Works and Highways (DPWH) along Amburayan River. Citing a report submitted by DPWH La Union 1st District Engineering Office, Secretary Mark Villar […]

Categories
Government

KAYKULOT BRIDGE TO TAGAYTAY NOW OPEN – VILLAR

The Department of Public Works and Highways (DPWH) has completed a new bridge leading to tourism destinations in Tagaytay City, Cavite. Secretary Mark Villar recently led the ceremonial opening of Kaykulot Bridge connecting Tagaytay-Calamba Road to Sta. Rosa-Ulat-Tagaytay Road, Cavite. Villar said that this 90-lineal meter bridge is a key component of the Kaykulot Road […]

Categories
Government

2 MAJOR CLLEX SEGMENTS 100% COMPLETE – VILLAR

Public Works and Highways Secretary Mark Villar announced two of the major segments of Central Luzon Link Expressway (CLLEX) Project Phase 1 leading Cabanatuan City have been completed. “Construction of 4.1-km contract package (CP)1 – Tarlac Section and 6.4-km CP2 – Rio Chico River Bridge Section are now 100 percent finished,” Villar said. “The completed […]

Categories
Government

BORACAY CIRCUMFERENTIAL ROAD NOW IMPROVED – VILLAR

Local and international tourists can now utilize a much-improved road going around the world-famous Boracay Island in Malay, Aklan, with the completion of the 8.73-kilometer portion of Boracay Circumferential Road Project of the Department of Public Works and Highways (DPWH). DPWH Secretary Mark Villar recently inaugurated the completed Phase 1 and 2 road portions that […]

Categories
Government

2 PANGASINAN QUARANTINE FACILITIES READY – VILLAR

The Department of Public Works and Highways (DPWH) has completed the conversion of two buildings into quarantine facilities to be used by coronavirus disease (COVID-19) patients in Burgos and Sta. Barbara, Pangasinan. Based on a report from DPWH Region 1 Director RonnelTan, DPWH Secretary and isolation czar Mark Villar announced that the repurposing of Pangasinan […]

Categories
Government

LEYTE’S ALBUERA RIVER WALL 100% COMPLETE – VILLAR

Locals residing in low-lying areas of Barangay Poblacion in the town of Albuera in Leyte are now protected from the dangers of the overflowing of river with the newly-completed flood control structure by the Department of Public Works and Highways (DPWH). The 300-linear meter flood control project is part of the government’s flagship, Build, Build, […]

Categories
Government

SURALLAH-GENSAN BYPASS ROAD 95% COMPLETE – VILLAR

Public Works and Highways Mark Villar said that the P3.4-billion Surallah-T’boli-San Jose-General Santos City Road is on track with ongoing civil works already reaching 95 percent accomplishment. Citing reports from DPWH Region 12 Director Basir Ibrahim, Villar explained that the multi-year project involves the construction of a 66.69-kilometer, two-lane concrete road, two bridges, with provision […]